2024年1月11日发(作者:雪佛兰系列车型及报价)

Ford Acronym List

ACRONYM

(CP)

(J1)

(ST)

(TTO)

(PT)

PT(P/T)

(SP)

1MIS

LS

PP

1PP

2PP

FS

KO

TT

PP

PP

PP

1PP

缩写TERM

目录

中文译名

Confirmation Prototype

Final Status

Job1

Surface Transfer

Change Cut-off

Kick Off

Lanch Readiness

Lanch Sign-off

Program Approval

Proportions & Hardpoints

Program Readiness

Strategy Confirmation

Strategy Intent

Strategy Planning

Structural Prototype

Final Status

Tool Try-Out

Final Data Judgement

Mass Production

Verification Prototype

Program Target Compatibility

Homologation Build

P/T Design Complete

Power Train

Pre Milestone 1

Pre Milestone 2

Structural Prototype

One Month in Service

Launch Sign Off

Production Proveout

First Production Proveout

Second Production Proveout

Final Sign-off

Kickoff

Tooling Trail

Production Proveout

Production Prototype

Pilot Production

First Production Proveout

确认样本

最终状态

整车投产

表面参数传递

更改完成

启动

投产准备就绪

投产验收

项目批准

比例与固定点

项目准备就绪

策略确认

策略意向

策略计划

样品结构

最终状态

工装设备试运行

最终资料评价

第一次正式生产

所有样件装车验证

项目目标兼容性

本地化生产

动力传动系统设计结束

动力传动系统

SI前里程碑1

SI前里程碑2

样车结构 Zksow}-%

投入使用1个月

投产验收

生产验证

第一次试生产

第二次试生产

最终验收

启动

工装验收/焊接生产线正式生产

生产验证

样件生产

试生产

首次生产验证

Ford Acronym List

ACRONYM

2PP

CC

SC

OS

Phase0

Phase1

Phase2

Phase3

Bl

Dr

Fo

Tr

Fl

UFL

Pi

RST

CPI

CT

SET

BND

BU

CU

HEM

PRE

TRA

HI

HIC

OS

IH ASSY

IH

EP/LP

LP

SP

SP/C

LP/C

A AA

ABS

ABS

ADJ

缩写TERM

目录

中文译名

Second Production Proveout

Critical Characteristic

Significant Characteristic

Operator Safty

Phase0 (Run at Rate)

Phase1 (Quality Verification)

Phase2 (Production Verification)

Phase3 (Capacity Verification)

Blanking

Drawing

Forming

Trimming

Flanging

Up Flange

Pierce

Restriken

Cam-Piercing

Cut

Separate

Bending

Burling

Curling

Hemming

Pre

Trans Far

High-Impact

High-Impact Characteristics

Operator Safty

In House Assembly

In House Component

Outsourcing Delivery Level –Assy or Component

Local Component or Sub-Assy

Import Component Or Sub-Assy

Local Component Or Sub-Assy, Consign to Supplier

American Automobile Association

Affordable Business Structure

Anti skid brake system

Adjustment

第二次生产验证

关键特性

重要特性

操作者安全

节拍验证(模具调试样件合格)

质量验证阶段

生产验证阶段

产能验证阶段

落料

拉延

成形

切边

翻边

上翻边

冲孔

整形

侧冲孔

切断

切开

压弯

翻口

卷耳

折边

预备

多工位

重大影响

重大影响特性

操作者安全

长安福特装配总成

长安福特总成

交付状态-总成或组件

冲压片件

进口标件

供应商采购本地标件

美国汽车工业联合会

可承受商业构架

防抱死制动系统

调整

Import Component Or Sub-Assy, Consign to Supplier

供应商采购进口标件

Ford Acronym List

ACRONYM

AEC

AIAG

AIMS

AME

AMPPE

AND

ANOVA

ANSI

AP

AP

APA

APEAL

APQP

APW

AQS

ARL

ASAP

ASC

ASL

ASEAN

ASN

ASQ

ASME

ASTM

AT&ME

ATP

AVT

AW

AWB

AWS

B&A

BCCP

BCG

BHF

BHI

BIC

BMAW

BOL

缩写TERM

目录

中文译名

Additional Engineering Changes

Automotive Industry Action Group

Automated Issues Matrix System

Advanced Manufacturing Engineering

Advanced Manufacturing Pre-Program Engineering

Addendum

Analysis of Variance

American National Standard Institute

Advanced Purchasing

Attribute Prototype

Advanced Program Approval

Automotive Performance Execution and Layout

Advanced Product Quality Planning

Average Per Weekly

Analysis Of Quality Of Surface

Attribute Requirement List

As Soon As Possible

Accredited Standard Committee

Ford Motor Company Approved Source List

Association Of Southeast Asian Nations

Advanced Shipping Note

American Society for Quality

American Society Of Mechanical Engineers

American Society For Testing & Materials

Advanced Technology & Material Engineering

Authority To Proceed

Advanced Vehicle Technology

Arc Welding

Air way Bill Of Lading

Analytical Warranty System

Body & Assembly Operations (New Term: Vehicle

Operations)

Body Construction Control Point

Business Consumer Group

Blank Holder Force

Bake Hardening Index

Best in Class

Bare Metal Arc Welding

Bill Of Lading

附加工程更改

机动车工业行动小组

问题结构图系统

先进制造工艺

先进项目前制造工艺

工艺补充

多样性/方差分析法

美国国家标准协会

先期采购

设计样车

先期项目批准

机动车性能实施与规划

先进产品质量计划

每周平均产能

表面质量分析

属性要求清单

尽可能快地

认证标准协会

福特汽车公司批准货源清单

东盟

提前通知货运单/送货单

美国质量协会

美国机械工程师协会

美国试验材料协会

先进技术材料工程

执行授权

先进汽车技术

电弧焊

空运提单

分析性的保修系统

车身与组装操作(新术语:车辆操作)

车身结构控制点

消费者工作组

压边圈力

烘烤硬化指数

等级中的最佳

无保护金属丝电弧焊接

提货单

Ford Acronym List

ACRONYM

BOM

BOP

BOS

BIW

BTS

BUR

CA

CAD

CAE

CAP

CAR

CAR

CAS

CAW

CAW-G

CBG

CDS

C/E

CETP

CFR

CFT

CIM

CIP

CIWG

CM

CMA

CMM

CMMS

CMR

Code X

Code Y

CP

CPA

CPE

CPK

CPU

CPV

CQDC

CQIS

缩写TERM

目录

中文译名

Bill Of Materials

Bill Of Process

Business Operating System

Body In White

Build-To-Schedule

Business Unit Review

Customer Attribute

Computer Aided Design

Computer Aided Engneering

Corrective Action Plan

Capacity Analysis Report

Corrective Action Request

Capacity Analysis Sheet

Carbon Arc Welding

Carbon Arc Welding-Gas

Consumer Business Group

Component Design Specification

Cause & Effect

Corporate Engineering Test Procedures

Constant Failure Rate

Cross Functinal Team

Computer Integrated Manufacturing

Continous Improvement Process

Continuous Improvement Work Group

Control Means

Central Material Area

Coordinate Measuring Machine

Common Material Management System

Control and Measurement Report

Pre-build focusing on exterior components

Pre-build focusing on interior components

Confirmation Prototype

Commercial and Program Agreement

Chief Program Engineer

Capability Index For A Stable Process

Cost Per Unit

Capacity Planning Volume

Corporate Quality Development Center

Common Quality Indicator System

物料清单

过程清单

商业作业系统概述

白车身零件

按日程建造

业务小组讨论

消费者特性

计算机辅助设计

电脑辅助工程

纠正行动计划

产能分析报告

整改需求

能力分析表

碳弧焊

气体保护碳弧焊

消费者业务小组

零件设计参数

成因及影响

企业工程试验程序

连续故障率

多方认证小组

计算机综合制造

持续改进过程

持续改进工作组

控制手段

中心材料区域

三坐标测量设备

通用材料管理系统

控制及测量报告

制造前关注的外部零件

制造前关注的内部零件

验证原型车

商业及项目协议

首席项目工程师

过程能力指数

单位成本

产能规划

企业质量开发中心

一般质量指标系统

Ford Acronym List

ACRONYM

CR

CR&CR

CRP

CRT

CS

CSA

CSI

CTQ

CTS

CUM

CV

CVL

CVR

DA

DCIS

DCP

DCP

DDL

DFA

DFM

DFMEA

DFR

DFSS

DIN

DL

DMAIC

DOE

DON

DP

DPA

DPA

DPV

DPV

DQR

DTD

DTD

DV

缩写TERM

目录

中文译名

Concern Responses

Change Request & Concern Report

Capacity Requirement Planning

Component Review Team

Customer Satisfaction

Corporate Security Administrator

Customer Service Index

Critical To Quality

Component Technical Specification

Cumulative

Capacity Verification

Capacity Verification Letter

Capacity Volume

Directic Des Achat

Dynamic Control Plan

Dimensional Control Plan

Direct Data Link

Design for Assembly

Design for Manufacturability

Design Failure Mode And Effects Analysis

Decreasing Failure Rate

Design For Six Sigma

Deutsches Institution(Federal Republic Of Germany)

Die Layout

Define, Measure, Analysis, Improve, Control

Design Of Experiment

Delivery Of Number

Design Parameters

Digital Pre-Assembly

Digital Predicted Assembly

Customer Demand Per Day

Daily Production Volume

Durability Quality and Reliability

Dock To Dock

Design to Delivery

Design Verification

问题回复

变更请求单和问题报告

产能要求计划

零件审核/讨论小组

客户满意度

企业安全管理员

客户服务指数

关键质量特性

零件技术规范

到上一批的累积交货数量

产能验证

产能确认信

产能分析阶段

采购部(PCA)

装车问题清单/零件质量改善

动态控制计划

尺寸控制计划

直接数据联接

总成设计/设计的装配要求

制造能力设计

设计失效模式及后果分析

故障下降率

六西格玛设计(对流程新产品的设计方法)

德国联邦共和国

模具工艺过程图

定义、测量、分析、改进、控制(六西格玛改进方法)

试验设计

交付订单号

参数设计

数字化预装配

数字化预装车

客户每天需求量

日产量

耐久性质量与可靠性

进货至出货

设计到交付

设计验证

Ford Acronym List

ACRONYM

DVA

DVM

DVP&SOR

DVA

DVP&PV

DVPV

DVP&R

DVPR

EAO

EASI

ECC

ECCS

ECM

EDI

ED&T

EMS

EOC

EOP

EQA

EQI

ES

ESI

ERP

ESO

ESP

ESSE

ESTA

ESWP

ETA

ETA

EV

FAI

FAO

FAQ

FASS

FCL

FCPA

FCSD

缩写TERM

目录

中文译名

Dimensional Verification Analysis

Design Verification Method

Design Verification Plan & Sign-Off Report

Dimensional Variation Analysis

Design Verification Process and Production

Validation

Design Verification& Production Validation

Design Verification Plan & Report

Design Verification & Product Reliability

European Automotive Operations

Engineering And Supply Information

Engineering Change

Engineering Change Comparision Sheet

Essential Characteristic To Measure

Electronic Data Interchange

Engineering Development & Testing

Environmental Management System

Edge Of Coil

Edge Of Pa Environmental Management System rt

Environment Quality Assurance

Extraordinary Quality Initiative

Engineering Specifications

Early Supplier Involvement

Enterprise Resource Planning

Engineering Sign-Off

Extended Service Plan

Engineering Standard & System Engineering

Early Sourcing Target Agreement

Early Sourcing Work Plan

Estimated Time Of Arrival

Early Tooling Authorization

Equipment Variation

First Article Inspection

Ford Automotive Operations

Frequently Asked Questions

Field Action/Stop Shipment

Full Container Load

Ford Consumer Product Audit

Ford Customer Service Division

尺寸验证分析

设计验证方式

设计验证计划和验收报告

尺寸变差分析

设计验证程序和产品验证

设计验证和程序验证

设计验证计划和结果

设计验证和产品可靠性

欧洲机动车协会

工程和供应信息

工程变更

工程变更对照表

本质特性测量

电子数据交换

工程开发及试验

环境管理系统

卷带边缘

零件边缘

环境质量保证

特别初始质量

工程参数

早期供应商参与

企业资源计划

工程签收

延期服务计划

工程标准及和体系工程

早期选点目标协议

早期选点工作计划

预计到达日期

前期工装批准(授权)

设备变更

首件检验

福特汽车操作

常见问答

区域行动/停止运货

整箱货

福特消费者产品审核

福特顾客服务部

Ford Acronym List

ACRONYM

FDJ

FDVS

FEC

FEP

FER

FEU

FIFO

FLD

FMA

FMC

FMVSS

FPA

FPA

FPDS

FPS

FQRs

FR

FRG

FRT

FS

FSLI

FSN

FSP

FSR

FSS

F&T

FTA

FTC

FTEP

FTT

FUNC-APPRV

FVEP

G8D

GAP

GAQO

GC

GCARS

GCEQ

GCP

缩写TERM

目录

中文译名

Final Data Judgement

Ford Design Verification System

Final Engineering Confirmation

Faults Elimination Plan

Final Engineering Review

Field Evaluation Unit

First in First Out

Forming Limit Diagram

Failure Mode Avoidance

Ford Motor Company

Federal Motor Vehicle Safety Standards

FMC Product Audit

Final Product/Paint Audit

Ford Product Development System

Ford Production System

Frequent Quality Rejects

Functional Requirements

Ford Reliability Guidelines

Failure Rate Test

Final Sign-off

Ford Supplier Learning Institute

Ford Supplier Network

Ford Supplier Portal

Final Status Report

Full Service Suppliers

Facility & Tooling

Fault Tree Analysis

Functional And Technical Characteristic

Ford Technology Educational Program

First Time Through

Functional Approvals

Finished Vehicle Evaluation Program

Global Eight Discipline

Global Architectural Standard

Garant Assurance Qualité Opérationnelle

Global Craftsmanship

Global Craftsmanship Attribute Rating System

Global Core Engineering Quality

Global Capacity Planning

最终数据批准

福特设计验证系统

最终工程确认

故障消除计划

最终工程论证

区域评估组

先进先出

成型极限图

失效模式避免

福特汽车公司

美国联邦机动车安全标准

福特产品审核

最终产品/涂料审核

福特产品开发计划

福特生产系统

经常性质量不合格品

功能要求

福特可靠性试验

故障率试验

最终验收

福特培训学院

福特供应商网络

福特供应商入口网站

最终状态报告

全方位服务供应商

工装设备

故障树分析

功能技术特性

福特技术教育项目

首次通过

功能批准

下线车辆评估项目

全球8条纪律报告

全球建筑水准

质量运作保证

全球技术工艺

全球技术特性评分系统

全球核心工程质量

全球产能计划

Ford Acronym List

ACRONYM

GCPT

GDCD

GD&T

GEC

GES

GIS1

GMAB

GMAW

GMIR

GOR

GPDS

GPIRS

GPP

GPP

GQRS

GRC

GRC

GR&R

GRVW

GSDB

GSSM

GYR

HACCP

HAZ

HB

HSS

IAA

ICA

ICCD

ICE

ICPSW

IE

IFR

ILVS

ILVS

IM

IMC

IMDS

缩写TERM

目录

中文译名

Ford Global Capacity Planning Team

Global Dimension Control Department

Geometric Dimensioning &Tolerance

Global Electronic Commence Hub

Global Engineering Standard

Global Information Standards

Gas Metal Arc Brazing

Gas Metal Arc Welding

Global Material Reporting and Integration

Grille Opening Reinforcement

Global Product Development System

Global Prototype Inventory Requisition and

Scheduling

Good Parts Product

Global Parts Pricing

Global Quality Research System

UN-ECE Group des Raporteurs de Ceintures

Government Regulations Coordinator

Gage Repeatability and Reproducibility

Gross Vehicle Weight

Global Supplier Database

Global Sourcing Stakeholders Meeting

Green-Yellow-Red

Hazard Analysis Critical Control Point

Heat-Affected Zone

Homologation Build

High Speed Steel

Interim Approval Report

Interim Containment Action

Intensified Customer Concern Database

In Car Entertainment

Interim Capacity PSW

Industrial Engineer

Increasing Failure Rate

In-Line Vehicle Sequencing

In-Line Vehicle Sequencing

Industrial Materials

ISO-Modular Carton

International Material Data System

福特全球产能计划小组

全球尺寸管控部

几何尺寸与公差

全球电子商务平台

全球工程标准

全球信息标准

气体保护金属丝钎焊

气体保护金属丝电弧焊

全球材料报告及综合

车头塑钢结构

全球产品发展系统

全球样件库存及控制安排

合格产品生产

全球零件定价

全球质量调查系统

欧盟 ECE 安全带规划小组

政府法规协调员

量具重复性和再现性

车辆质量

全球供应商数据库

全球选点股东大会

绿-黄-红

危害分析和关键控制点

热影响区

所有样件继续装车验证

高速钢

临时批准报告

过渡性补救措施

强化的客户问题数据库

车内娱乐设施

临时产能PSW

产业工程师

故障率增长

车辆顺序

线上车辆排序

工业材料

标准化包装

国际材料数据系统

Ford Acronym List

ACRONYM

IPD

IPD

IQ

IQPSW

IQS2

IR

IS

ISIR

ISO

ISPC

ISPC

IVP

JFS

JIS

JIT

JPH

JSA

LTL

KCC

KKK

KLT

KPC

KPOV

KTM

LCL

LDA

LDEM

LLP

LM

LMB

LMC

LP&T

LOA

LRR

LTL

MAP

MAV

MBO

缩写TERM

目录

中文译名

In Plant Date

Integrated Product Development

Incoming Quality

Interim Quality PSW

Initial Quality Study

Internal Reject

Initial Samples

Initial Sample Inspection Report

International Organization for Standardization

In-Station Process Controls

In Station Process Control

Integration and Validation Plan

Japan Iron and Steel Federation Standard

Japan Industrial Standard

Just in Time

Jobs Per Hour

Job Safety Analysis

Less-Than-Truckload

Key Control Characteristic

PSW not ready for inspection

Key Life Test

Key Product Characteristic

Key Process Output Variables

Less Container Load

Lean Deployment Assessment

Lean Design Evaluation Matrix

Lead Logistics Provider

Lot Method

Least Material Boundary

Least Material Condition

Launch Planning & Training

Letter of Agreement

Launch Readiness Review

Less than truckload

Manufacturing Assembly Pilot

Minimum Adjustable Value

Manufacturing Business Office

进厂日

集成产品开发

进货质量

临时质量PSW

初始质量研究

内部不合格品

初始样品

首件样品检验报告

国际标准化组织

过程质量控制

站内过程控制

整合及验证计划

日本钢铁联盟标准

日本工业标准

及时

每小时工作量

工作安全分析

散装拼车

过程特殊特性

PSW (零件质量合格验收) 未做好检测准备

关键寿命试验

产品特殊特性

关键过程输出变量

装车尺寸精度

拼箱货

精益生产配置评估

设计评估表

主导物料服务供应商

分批法

最小实体边界

最小实体状态

投产计划和培训

协议书

投产准备就绪前审查

散装拼车

制造装配启动项目

最小可调节值

制造办公室

Ford Acronym List

ACRONYM

MCPV

MCT

MDP

ME

MES

ME&T

MFG

MFT

MIS

MH&PE

MMB

MMC

MMOG

MMS

MMSA

MOB

MOD

MP

MP&L

MPPS

MPS

MPW

MQR

MRB

MRD

MRF

MRO

MS

MSA

MTBF

MTC

MTTF

MTTR

MUD

MVS

MWT

MY

NAAO

NAT

缩写TERM

目录

中文译名

Manufacturing Capacity Planning Volumes System

Manufacturing Cycle Time

Manufactured from Definitive Process

Manufacturing Engineering

Mazda Engineering Standard

Materials Engineering Test

Manufacturing

Manufactured From definitive Tools

Months in Service

Material Handling & Packaging Engineering

Maximum Material Boundary

Maximum Material Condition

Materials Management Operation Guideline

Materials Management System

Material Management System Assessment

Management Of Objectives

Module

Measuring Point

Material Planning & Logistic

Manufacturing Process Planning System

Master Production Schedule

Max Per Weekly

Management Quality Review

Material Review Board

Material Required Date

Management de la Relation Fournisseur

Maintenance Repair And Operation

Material Specifications

Measurement System Analysis

Mean Time Between Failure

Manage the Change

Mean Time To Failure

Mean Time Repair

Material Utility Data

Measurement Variation Study

Mean Waiting Time

Model Year

North American Automotive Operations

Net Available Time

生产计划产能系统

生产周期

限定过程制造

制造工程

马自达工程标准

材料工程试验

制造/生产

限定工装制造

使用中的月份

物料控制及包装工程

最大实体状态

最大实体状态

物流管理运作指南

物料管理系统

物料管理系统评估

目标管理

模块

检测点

物料计划及物流

制造程序计划系统

主生产计划

每周最大产能

管理评审报告

物料论证板

物料要求到厂日

供应商相关信息管理(PCA)

维护修理运行

物料参数

测量系统分析

平均失效间隔

管理变更

平均失效时间

平均修理时间

材料利用率

测量变差研究

平均等待时间

年度车型

北美汽车工业协会

净利用时间

Ford Acronym List

ACRONYM

NC

NCR

NFM

NICT

NIST

NMPDC

NOVA C

NTEI

NVH

OCM

ODM

OEE

OEE

OEM

O/Head

OHSAS

OPD

OTG

OTS

PAG

PA

PAL

PAT

PBCP

PCA

PCF

PCI

PCM

PCP

PCRR

PD

PDL

PDM

PDPC

PDSA

PDT

缩写TERM

目录

中文译名

Numerical Control

Non Conformity Rate

Noise Factor Management

Net Ideal Cycle Time

National Institute Of Standard & Technology

New Model Program Development Center

New Overall Vehicle Audit

New Tooled End Item

Noise, Vibration & Hardshness

Operating Committee Meeting

Original Design Manufacturer

Overall Equipment Effectiveness

Original Equipment Effectiveness

Original Equipment Manufacturer

On-Producing Development

Open to Go

Off Tooling Sample

Premier Automotive Group

Program Approval

Project Attribute Leadership

Program Activity Team, Program Attribute Team, or

Program Action Team

Prototype Build Control Plan

Permanent Corrective Action

Parts Coordinate Fixture

Product Change Information

Programmable Control Modules

Part Control Plan

Particular Claused And Planning Of Results

Product Development

Program Direction Letter

Product Data Management

Process Decision Program Chart

Plan, Do, Study, Act

Program Development Team

数控

不合格率

噪声管理

净理想周期

国家标准局/国际技术标准研究院(美国)

新车型项目开发中心

新车总评审

新工装生产成品

噪音、共振、硬度

工作委员会会议

原厂委托设计

设备整体效率

原始设备效率

原厂委托制造

加成/管理

在产车型开发

可进行

正式工装/模具生产样品/全工装样件;半工装/工装样件

首要机动车项目组/首席汽车集团

项目批准

项目特性领导层

项目促进小组、项目特性小组和项目行动小组

样件制造控制计划

持续改进行动

检查样件匹配质量/零件匹配检具

产品变更信息

项目控制模块

零件控制计划

特殊条款及结果计划(PSA)

产品开发

项目指导信

产品数据管理

过程决定计划图

计划、实践、研讨、实施

项目开发组

Occupational Health And Safety Assessment System 职业安全卫士管理体系

Ford Acronym List

ACRONYM

PEC

PEO

PEP

PFC

PFEP

PFMEA

PI

PIPC

PIST

PLM

PM

PM

PMA

PMS

PMT

PMXP

PO

POP

POS

Pp

PPAP

PPC

PPC

PPE

PPGTC

PPHR

PPK

PPL

PPM

PPPM

PP&T

PQP

PR

PR

PRR

PR/R

PS

缩写TERM

目录

中文译名

Preliminary Engineering Completion

Product Engineering Office

Product Development Process

Process Flow Chart

Plan For Every Part

Process Failure Mode And Effects Analysis

Process Improvement

Percent Indices Which Are Process Capable

Percent Inspection Point That Satisfy Tolerance

Product Lifecycle Management

Program Manger

Preventive Maintenance

Project Management Analyst

Power Production Management System

Program Management Team or Program Module

Team

Peinture MatériauX et Procédés

Purchase Order

Paid On Production

Parts Order System

Process Potential

Production Parts Approval Process

Purchase Part Capacity

Product Planning Committee

Personal Protection Equipment

Production Purchasing Global Terms & Conditions

Past Problem History Roadmap

Performance Index For a Stable Process/ Process

Capability

Program Parts List

Parts Per Million

Program and Pre-Production Management

Product Planning & Technology

Product Quality Planning

Product Requirement

Product Readiness Milestone

Problem Resolution Report

Problem Report /Resolution

Program Start

初始工程批准/完成

产品工程办公室

产品开发流程

过程流程图

零件做计划

过程失效模式及后果分析

程序改进

过程能力的指标比率

检验点满足公差的比率

产品生命周期管理

项目经理

预防性维护

项目管理分析

产能管理体系

项目管理组或项目模式组

涂漆材料及工艺(PSA)

采购订单

下线支付件

订货系统

程序潜力

生产件批准程序

采购零件产能

产品计划委员会

劳保用品

生产采购全球条款条件

历史问题记录板

过程能力指数/程序能力

项目零件清单

每百万

程序和投产前管理

产品计划和技术

产品质量计划

产品要求

产品就绪时间节点

问题解决报告

问题报告及解决

项目开始

Ford Acronym List

ACRONYM

PSA/PCA

PSC

PSC

PST

PSW

PT

PTA

PTC

PTC

PTCC

PTR

PV

PV

PV

PVA

PVBR

PVM

PVP

PVP&R

PVT

PW

Q3P

QA

QC

QCT

QCWF

QFD

QFD

QFTF

QLS

QMS

QOE

QOP

QOS

QPM

QPS

QR

QSA

缩写TERM

目录

中文译名

geot Société Anonyme/ Peugeot Citro?n Automobile

Program Strategy Confirmation

Premium Service Center

Program Steering Team

Part Submission Warrant

Powertrain

Preliminary Technical Analysis

Program Target Confirmation

Pass-Through Characteristics

Program Target Compatibility Checkpoint

Part Trial Run

Production Validation

Process Variables

Part Variation

Percent Value Added

Prototype Vehicle Build Requirements

Production Verification Methods

Powertrain Validation Program

Production Validation Plan And Report

Product Vehicle Team or Plant Vehicle Team

Projection Welding

Qualification Progressive du Produit et du Process

Quality Assurance

Quality Control

Quality Cost Timing

Quality, Cost, Weight, Functional Target

Quality Functional Development

Quality Function Deployment

Quality Focused Test Fleet

Quality Leadership System

Quality Management System

Quality of Event

Quote One Page

Quality Operating System

Quality Program Manager

Quality Process System

Quality Reject

Quality System Assessment

法国标致

项目策略确定

付费服务中心

项目指导小组

零件质量合格验收

动力系统

初始技术分析

项目目标确认

过程特性/转传特性

项目目标兼容性检查点

零件进行试生产

产品验证

程序变更

零件变更

增值百分比

样车制造要求

生产验证方法

传动系统验证程序

生产验证计划及报告

产品车辆组或工厂车辆组

凸焊

合格、进步、产品、工艺(PCA)

质量保证

质量控制

质量成本时机选择

质量、成本、重量及功能目标

品质功能展开

质量功能展开/配备

质量节点测试行动组

质量领导体系

质量管理体系

质量事件

报价记录单

质量运行系统

质量项目经理

质量程序系统

质量拒收

质量系统评审

Ford Acronym List

ACRONYM

QSA-PD

QSE

QSR

QTC

QVA

QVP

RACF

RAN

R

RAN

RB

RCP

RFQ

RFS

RH

R&M

RMS

ROA

ROCOF

RPN

R@R

R&R

R&R

RSEW

RSMS

RSW

R&VT

RWUP

SA

SAL

SAR

SBOM

SCM

SDS

SEI

SEM

SEVA

SFQ

缩写TERM

目录

中文译名

Quality System Assessment for Product

Development

Quality System Efficiency

Quality System Requirement

Quotes Tool Capacity

Quality-Focused Value Analysis Workshop

Quality Verification Plan

Resource Access Control Facility

Release Authorization Number

Range

Receipt Authorization Number

Resistance Brazing

Risks Control Plan

Request For Quotation

Regardless Of Feature Size

Relative Humidity

Reliability and Maintainability

Resource Management System

Return on Assets

Rate of Occurrence of Failure

Run @ Rate

Repeatability and Reproducibility

Roles and Responsibilities

Resistance Seam Welding

Restriction Substance Management Standard

Resistance Spot Welding

Research & Vehicle Technology

Real World Usage Profile

Sourcing Agreement

Sourcing Agreement Letter

Sample Approval Report

Service Bill Of Material

Supplier Chain Management

System Design Specification

Software Engineering Institute

Scanning Electron Microscope

Systems Engineering Value Analysis

Sourcing For Quality

产品开发质量体系评估

质量体系效率

质量系统要求

工装报价能力

车间质量重点价值分析

质量审核计划

资源访问控制设施

发放授权号

范围

收据授权号

电阻钎焊

风险控制计划

询价

不考虑形态尺寸

相对湿度

可靠性及可维护性

资源管理系统

资产回报率

故障发生率

生产节拍

重复性和再现性

职务与责任

电阻缝焊

限制性物质管理标准

电阻点焊

研究与车辆技术

现实使用剖面

选点协议

选点协议书

样品批准报告

售后服务物料清单

供应链管理

体系设计规范

软件工程协会

扫描电子显微镜

系统工程价值分析

质量选点

Risk Priority Number Related To FMEA Development

风险顺序数

Ford Acronym List

ACRONYM

SFSL

SI

SID

SIM

SIM

SI Unit

SMF

SMRL

SMRT

SOP

SOP

SOW

SP

SP/AP

SP&PI

SPC

SPC

SPR

SPROM

SQA

SRI

SREA

SRI

SSM

SST

STA

STARS

SUV

TA

TAKT

TAP

TBD

TBE

TCF

TCM

TCMP

TED

TEM

TGA

缩写TERM

目录

中文译名

Single Faults Supplier List

System International des Unit

Supplier/Shipment Identification Number

Simulation

Supplier Improvement Metrics

International Standard Unit

Synchronous Material Flow

Sheet Metal Requirements List

Supplier Manufacturing Readiness Team

Standard Of Procedure

Start Of Production

Statement of Work

Support Plan

Structural Prototype/Attribute Prototype

Strategic Process & Product Improvement

Special Product Committee

Statistical Process Control

Significant Production Run

Sample Promise Date

Supplier Quality Assurance

Surface Required Illustration

Supplier Request for Engineering Approval

Supplier Responsible Issues

Strategic Sourcing Meeting

Supplier Specific Tools

Supplier Technology Assistance

Supplier Tracking and Reporting System

Sports Utility Vehicle

Target Agreement

Available Time/Customer Demand

Target Achievement Plan

To Be Determined

Test Be Cancelled

Total Cost Management

Total Cost Management Plan

Things Engineers Do

Total Equipment Management

Réalisation Outillage

单故障供应商清单

国际单位制

供应商/运输标识号

仿真

供应商改进提升指标/改进步骤

国际标准单位

同步材料流动

金属板要求清单

供应商制造准备小组

标准作业流程

正式生产

工作陈述

支持计划

结构原形/特性原形

策略性程序和产品改进

特殊产品委员会

统计程序控制

重要生产运行

承诺的样品到货日

供应商质量保证

表面要求说明

供方工程批准申请

供应商责任

策略选点会议

供应商特殊工装

供应商技术支持

供应商跟踪及汇报系统

运动型汽车

目标协议

可利用时间和客户需要

目标完成计划

有待确定

取消试验

总装

总成本管理

成本管理计划总计

工程师任务

全部设备管理

工装制作(PCA)

Ford Acronym List

ACRONYM

TGR

TGW

TIS

TKO

TOC

TPD

TPM

TPPS

TQC

TQC

TQM

TPM

TRIP

TTO

TVDCD

UB

UCL

USL

UHSS

V/C

VDA

VDI

VDP

VDS

VCC

VER

VFG

VO

VOC

VOWE

VP

VPP

VQE

VQL

VQR

VRT

VRT

VRT

缩写TERM

目录

中文译名

Things Gone Right

Things Gone Wrong

Time in Service

Tooling Kick-Off

Table of Contents

Temporary Production Decision

Total Productive Maintenance

Torque Process Potential Study

Total Quality Control

True Quality Characteristics

Total Quality Management

Total Productive Maintenance

Transformation-Induced Plasticity

Tool Try Out

Total Vehicle Dimensional Control Discipline

Upperbody

Upper Control Limit

Upper Specification Limit

Ultra High Strength Steel

Very or Completely Satisfied

Verband der Automobilindustrie-International

Standard

Vehicle Dependability Index

Vehicle Development Process

Vehicle Design Specification

Volvo Car Corporate

Vehicle Evaluation Ratings

Vehicle Function Group

Vehicle Operation

Voice Of Customer

Vehicle Operations Welding Engineering

Verification Prototype

Vehicle Program Plan

Volvo Quality Excellent

Vehicle Quality Level

Vehicle Quality Review

Vehicle Review Team

Variability Reduction Team

Vehicle Reduction Team

事态发展正确

事态发展错误

服务期限

工装启动

目录

临时生产决定

全部生产维护

扭矩程序潜力研究

全面质量管理

真实质量特性

全面质量管理

全员生产维修

高强度及高延性

焊接工装回厂安装调试

总体车辆尺寸控制原则

上车身

上限控制

参数上限

超强度钢

非常或完全满意

德国汽车工业协会-国际标准

车辆可靠性指标

车辆开发过程

福特车辆设计规范/参数

沃尔沃汽车公司

车辆评估等级

车辆功能组

主机厂

客户声音

车辆运行焊接工程

样件验证

整车项目计划

沃尔沃卓越质量

车辆质量级别

车辆质量研讨

车辆研讨小组

减少差异小组

车辆减产小组

Ford Acronym List

ACRONYM

VTS

VTTO

WAS

WBT

WCR

WERS

WIP

3M

缩写TERM

目录

中文译名

Vehicle Tracking System

Verification(vendor) Tool Try out

Work Analysis Sheet

Web-based Training

Worldwide Customer Requirement

World wide Engineering Release System

Work In Progress

Minnesota, Mining And Manufacturing

整车生产跟踪系统

焊接工装设备预验收

工作分析表

网上培训

全球客户要求

全球工程信息发布系统

在制品/在产品

更多推荐

质量,计划,项目,全球