3CIVIL WORK 土建工程DESCRIPTION描 述 QUANTITY 数 量 UNIT 单 位 UNIT COST 单 价 ITEM COST 合 价 SUB-TOTAL 小 计ALL COSTS AREIN RMB TOTAL 总 计PhI1.11.1.21.1.31.1.41.1.51.1.6asPilePiling桩Load testing静载检测Sonic testing小应变检测Connection rebar接桩钢筋Grouting concrete灌芯砼C35Fo1.21.2.11.2.21.2.31.2.41.2.51.2.61.2.71.2.81.2.91.2.101.2.111.2.12unSteel Sheet Pile钢板桩围护WellPoint dewatering井点降水Excavation挖土Backfill回填土Transport soil out of site土方外运 150mm C15 ConcreteCushion150厚C15混凝土垫层20mm leveling layer ofWP20 cement mortar20厚WS20水泥砂浆找平层First layer of 3.0mm self-stick polymer modified一道3.0厚自粘聚合物改性沥青防水卷材(聚酯胎)防水层Two layers of 3.0 self-stickpolymer modified asphalt二道3.0厚自粘聚合物改性沥青防水卷材(聚酯胎)防水层15mm WS20 CementMortar isolated layer15厚WS20水泥砂浆隔离层50mm C20 fine aggregateconcrete50厚C20细石混凝土15mm WS20 cement mortarisolated layer15厚WS20水泥砂浆隔离层 7,300.00 198.00 1,439.00 1,378.00 92.00 1,439.00 74.00 1,800.00 m3 m3 m2 m2 m2 m2 m3 m2 78.00 569,400.00 490.00 97,020.00 8.00 11,512.00 95.00 130,910.00 190.00 17,480.00 8.00 11,512.00 498.00 36,852.00 8.00 14,400.00 2,300.00 m3 10.00 23,000.00 9,600.00 m3 13.00 124,800.00 1.00 lot 30,000.00 30,000.00 1.00 lot 180,000.00 180,000.00 22.75 m3 520.00 11,830.00 7.00 T 7,500.00 52,500.00 1.00 lot 15,000.00 15,000.00 1.00 lot 30,000.00 30,000.00 8,823.00 m 179.00 1,579,317.00 Totalwithout 11,861,472.08ManagementFees & Tax 11,666,236.03 1,688,647.00 5,764,685.33

3CIVIL WORK 土建工程ALL COSTS AREIN RMBDESCRIPTION QUANTITY UNIT UNIT COST ITEM COST SUB-TOTAL TOTAL描 述 数 量 单 位 单 价 合 价 小 计 总 计First layer of 3.0mm self-1.2.13stick polymer modified一道3.0厚自粘聚合物改性沥 1,660.00 m2 95.00 157,700.00青防水卷材Second layer of 3.0mm self-(聚酯胎)防水层1.2.14stick polymer modified二道3.0厚自粘聚合物改性沥 140.00 m2 190.00 26,600.00青防水卷材20mm leveling layer of(聚酯胎)防水层1.2.15WP20 cement mortar 1,800.00 m2 8.00 14,400.0020厚WP20水泥砂浆找平层1.2.1650mm fine sand 90.00 m3 230.00 20,700.0050120mm M10 solid concrete厚细砂保护层1.2.17brick wall120厚M10混凝土实心砖保护 226.00 m3 728.00 164,528.00墙1.2.18Pile caps bedding course 39.00 m3 490.00 19,110.00承台垫层砼Formwork for bedding1.2.19course 92.00 m2 81.50 7,498.00承台垫层模板1.2.20Steel bar for pile cap 29.60 t 5,120.00 151,552.00承台钢筋1.2.21Formwork for pile cap 276.00 m2 81.50 22,494.00承台模板1.2.22C30 concrete for pile cap 145.00 m3 510.00 73,950.00承台Foundation beams beddingC30砼1.2.23course 6.10 m3 490.00 2,989.00地梁垫层砼1.2.24Formwork for beam bedding 23.40 m2 81.50 1,907.10地梁垫层模板1.2.25Foundation beams steel bar 5.80 t 5,120.00 29,696.00地梁钢筋Foundation beams1.2.26formwork 136.00 m2 81.50 11,084.00地梁模板C30 Concrete of Foundation1.2.27Beams 21.30 m3 510.00 10,863.00地梁C30 P6 Concrete ofC30砼1.2.28Equipments Passage 741.68 m3 512.00 379,740.16设备通道混凝土Formwork of EquipmentsC30P61.2.29Passage 3,885.42 m2 81.50 316,661.73设备通道模板Steel Reinforcement of1.2.30Equipments Passage 110.84 T 5,120.00 567,500.80设备通道钢筋Concrete Cushions of Pump1.2.31house, Equipment泵房,设备通道及设备基础 216.20 m3 490.00 105,938.00垫层混凝土Formwork of concrete1.2.32cushion(Pump house,泵房,设备通道及设备基础 85.37 m2 81.50 6,957.66垫层模板Concrete work of Equipment1.2.33foundations(C30,P6) 936.83 m3 512.00 479,656.96设备基础混凝土C30P6

3CIVIL WORK 土建工程DESCRIPTION描 述 QUANTITY 数 量 402.23 98.94 517.90 1,450.20 161.30 92.46 431.50 22.50 UNIT 单 位 m2 T m3 m2 T m3 m2 T UNIT COST 单 价 ITEM COST 合 价 SUB-TOTAL 小 计ALL COSTS AREIN RMB TOTAL 总 计1.2.341.2.351.2.361.2.371.2.381.2.391.2.401.2.41Formwork of EquipmentFoundations设备基础模板Steel Rebar of EquipmentFoundations设备基础钢筋Concrete of Pump House(C30,P6)泵房混凝土C30P6Formwork of Pump House泵房模板Steel Rebar of Pump House泵房钢筋Concrete of SteelPillars(C30,P6)型钢柱混凝土C30O6Formwork of Steel PillarConcrete型钢柱模板Steel Rebar of Steel PillarConcrete型钢柱钢筋Gr 81.50 32,781.75 5,120.00 506,572.80 512.00 265,164.80 81.50 118,190.97 5,120.00 825,856.00 512.00 47,339.52 81.50 35,167.09 5,120.00 115,200.001.31.3.11.3.21.3.31.3.41.3.51.3.61.3.71.3.81.3.91.3.10ouSoil Compaction素土压实150mm detritus beddingcourse150mm碎石垫层50mm medium sandbedding course50mm厚中砂垫层300mm C30 Concrete300厚C30砼随捣随光Mono steel reinforcementnet∮14@200单层钢筋网双向∮14@200150mm C20 concrete150厚C20砼随捣随光Mono steel reinforcementnet ∮8@200单层钢筋网双向∮8@200Formwork of Floor地坪模板Floor block joint分仓缝Hardener Floor surface耐磨地面M 4,207.00 m2 36.00 151,452.00 600.00 m 8.00 4,800.00 156.00 m2 81.50 12,714.00 97.00 3.20 m3 t 498.00 48,306.00 5,120.00 16,384.00 810.00 38.00 m3 t 510.00 413,100.00

5,120.00 194,560.00 2,769.00 415.30 139.70 m2 m3 m3 8.00 22,152.00 260.00 107,978.00 230.00 32,131.00 1,003,577.00 BASF HardenFloor1.41.4.1aiSteel Rebar of floor plate楼承板钢筋 72.00 t 5,120.00 368,640.00

601,200.00

3CIVIL WORK 土建工程ALL COSTS AREIN RMBDESCRIPTION QUANTITY UNIT UNIT COST ITEM COST SUB-TOTAL TOTAL描 述 数 量 单 位 单 价 合 价 小 计 总 计1.4.2C30 concrete of floor plate 456.00 m3 510.00 232,560.00C30楼承板混凝土W1.5all200mm autoclaved aerated 1,402,634.901.5.1concrete under ±±0.0以下200厚蒸压加气混凝0.0 42.80 m3 720.00 30,816.00土砌块60mm C20 fine aggregated1.5.2concrete (φ4 bidirectional60厚C20细石混凝土(φ4双向 298.00 m 80.00 23,840.00@200240mm outer concrete防潮层1.5.3bricks 58.40 m3 786.00 45,902.40240200mm aerated concreted厚外墙混凝土砌块1.5.4bricks 736.00 m3 765.00 563,040.00200100mm aerated concrete厚加气混凝土砌块1.5.5bricks 4.10 m3 765.00 3,136.50100300mm high concrete厚加气混凝土砌块1.5.6waterproof wall 13.80 m3 510.00 7,038.00300Concrete surface adhesion高混凝土防水挡墙1.5.7agent 2,228.00 m2 8.00 17,824.00混凝土界面剂1.5.810mm WP15 cement mortar10厚WP15水泥砂浆打底压 12,757.00 m2 12.00 153,084.00实抹平2mm polyurethane1.5.9waterproof coat(non tar, two2厚聚氨酯防水涂料一层(非 242.00 m2 65.00 15,730.00焦油型,分两道刷)12mm WP5 composite1.5.10mortar 12,757.00 m2 12.00 153,084.00128mm WP10 composite厚WP5混合砂浆刮糙1.5.11mortar 12,757.00 m2 20.00 255,140.008厚WP10混合砂浆粉面1.5.1260mm GRC-M plates 1.00 lot 65,000.00 65,000.0060Fire proof treatment of厚GRC-M板封砌1.5.13Pillars 1.00 lot 69,000.00 69,000.00钢柱防火处理D1.6oo 389,122.80

1.6.1Aluminum alloy door 1024 5.00 sets -铝合金门10241.6.2Aluminum alloy door 1524 5.00 sets -铝合金门15241.6.3Aluminum alloy door 1524 1.00 sets -铝合金门15241.6.4Solid Plywood door 1021 9.00 sets -实木夹板门10211.6.5Solid Plywood door 1521 6.00 sets -实木夹板门1521

3CIVIL WORK 土建工程ALL COSTS AREIN RMBDESCRIPTION QUANTITY UNIT UNIT COST ITEM COST SUB-TOTAL TOTAL描 述 数 量 单 位 单 价 合 价 小 计 总 计Steel Roller Shutter Door1.6.63030 6.00 sets 11,664.00 69,984.00钢质卷帘门Grade A fireproof Roller30301.6.7Shutter door 3030 7.00 sets 16,735.20 117,146.40甲级防火卷帘门30301.6.8Grade A fireproof door 1521 8.00 sets 6,988.80 55,910.40甲级防火门15211.6.9Grade A fireproof door 1821 1.00 sets 7,826.40 7,826.40甲级防火门18211.6.10Grade A fireproof door 1021 2.00 sets 3,912.00 7,824.00甲级防火门10211.6.11Grade A fireproof door 1221 1.00 sets 4,752.00 4,752.00甲级防火门12211.6.12Grade A fireproof door 2424 1.00 sets 8,389.20 8,389.20甲级防火门24241.6.13Grade B fireproof door 1021 7.00 sets 3,760.80 26,325.60乙级防火门10211.6.14Grade B fireproof door 1521 6.00 sets 6,127.20 36,763.20乙级防火门15211.6.15Grade C fireproof door 0823 1.00 sets 3,168.00 3,168.00丙级防火门08231.6.16Grade C fireproof door 1223 10.00 sets 4,293.60 42,936.00丙级防火门12231.6.17Grade C fireproof door 1121 2.00 sets 4,048.80 8,097.60丙级防火门Aluminum alloy rainproof11211.6.18louver 0812 1.00 sets -铝合金防雨百叶窗Aluminum alloy rainproof08121.6.19louver 1608 1.00 sets -铝合金防雨百叶窗Aluminum Alloy rainproof16081.6.20louver 1524 4.00 sets -铝合金防雨百叶窗Aluminum alloy glass15241.6.21window 1524 7.00 sets -铝合金玻璃窗Aluminum alloy glass15241.6.22window 3024 14.00 sets -铝合金玻璃窗Aluminum alloy glass30241.6.23window 5024 3.00 sets -铝合金玻璃窗5024R1.7oo40mm foam glass, 140mm 770,019.001.7.1thermal insulation board40厚泡沫玻璃140保温板 2,989.00 m2 55.00 164,395.00

(燃烧性能minimum 30mm LC5.0 lightA级)

1.7.2aggregate concrete (2%最薄处30厚LC5.0轻集料混 2,989.00 m2 35.00 104,615.00凝土2%找坡层

3CIVIL WORK 土建工程DESCRIPTION描 述 QUANTITY 数 量 967.00 2,989.00 2,989.00 2,989.00 2,989.00 UNIT 单 位 m m2 m2 m2 m2 UNIT COST 单 价 ITEM COST 合 价 SUB-TOTAL 小 计ALL COSTS AREIN RMB TOTAL 总 计1.7.31.7.41.7.51.7.61.7.7Longitudinal & horizontaljoints (6m*6m)纵横缝的间距6000x600020mm WS20 cement mortarleveling layer with proper20厚WS20水泥砂浆找平层,找平层应留分格缝 ,缝4mm self-adhesive APPmodified asphalt Coil4厚自粘性APP改性沥青卷材Non-woven fabrics无纺布一层25mm WS20 CementMortar Protection layer25厚WS20水泥砂浆保护层Ot 5.00 4,835.00 13.00 38,857.00 120.00 358,680.00 18.00 53,802.00 15.00 44,835.001.81.6.11.6.21.6.3heAproll散水Firewall Scaffolding防火墙脚手架Ramp坡道Su 27.00 m2 210.00 5,670.00 720.00 m2 45.00 32,400.00 36.00 m 230.00 8,280.00 46,350.00

Ⅱ2.12.1.12.1.22.1.32.1.42.1.52.1.62.1.72.1.82.1.9bsFounExcavation挖土Backfill回填土Transport soil out of site土方外运Compact soil素土压实Bedding courseC15垫层Formworks垫层模板Rebar for foundation基础钢筋Formwork for foundation基础模板C30 concrete for foundation基础C30砼U 25.00 m3 510.00 12,750.00 87.00 m2 81.50 7,090.50 1.80 t 5,120.00 9,216.00 12.00 m2 81.50 978.00 6.80 m3 490.00 3,332.00 64.00 m2 8.00 512.00 64.00 m3 78.00 4,992.00 12.00 m3 10.00 120.00 76.00 m3 13.00 988.00 39,978.50 195,236.052.22.2.1ppC30 concrete column 4.88 m3 510.00 2,488.80 40,577.55

3CIVIL WORK 土建工程ALL COSTS AREIN RMBDESCRIPTION QUANTITY UNIT UNIT COST ITEM COST SUB-TOTAL TOTAL描 述 数 量 单 位 单 价 合 价 小 计 总 计C30砼柱2.2.2Reinforcement steel bar 0.80 t 5,120.00 4,096.00钢筋2.2.3Form works 8.50 m2 81.50 692.75模板2.2.4C30 concrete beam 7.90 m3 510.00 4,029.00C30砼梁2.2.5Reinforcement steel bar 1.80 t 5,120.00 9,216.00梁钢筋2.2.6Form works 78.00 m2 81.50 6,357.00梁模板2.2.7C30 concrete slab 8.60 m3 510.00 4,386.00C30砼板2.2.8Reinforcement steel bar 0.80 t 5,120.00 4,096.00钢筋2.2.9Formwork 64.00 m2 81.50 5,216.00模板W

3.3all240mm autoclaved aerated 66,354.803.3.1concrete bricks under ±±0.0以下240厚蒸压加气混凝0.0 15.40 m3 720.00 11,088.00土砌块60mm C20 fine aggregated3.3.2concrete (φ4 bidirectional60厚C20细石混凝土(φ4双向 64.00 m 80.00 5,120.00@200240mm concrete block of防潮层3.3.3outer walls 56.40 m3 786.00 44,330.40240240mm concrete block of厚外墙混凝土砌块3.3.4inner walls 7.40 m3 786.00 5,816.40240厚内墙砌块Fl3.4oo 13,781.203.4.1Soil Compaction 64.00 m2 8.00 512.00素土压实150mm detritus bedding

3.4.2course 9.40 m3 260.00 2,444.00碎石垫层150mm

3.4.3150mm C20 concrete 9.40 m3 498.00 4,681.20150厚C20砼随捣随光

3.4.4Rebar for floor 1.20 t 5,120.00 6,144.00地坪钢筋

R3.5oo40mm foam glass, 140mm 16,464.003.5.1thermal insulation board40厚泡沫玻璃140保温板(燃 64.00 m2 55.00 3,520.00

烧性能A级)minimum 30mm LC5.0 light

3.5.2aggregate concrete (2% 64.00 m2 35.00 2,240.00

3CIVIL WORK 土建工程DESCRIPTION描 述最薄处30厚LC5.0轻集料混凝土2%找坡层Longitudinal & horizontal QUANTITY 数 量 UNIT 单 位 UNIT COST 单 价 ITEM COST 合 价 SUB-TOTAL 小 计ALL COSTS AREIN RMB TOTAL 总 计3.5.33.5.43.5.53.5.63.5.7joints (6m*6m)纵横缝的间距6000x600020mm WS20 cement mortarleveling layer with proper20厚WS20水泥砂浆找平层,找平层应留分格缝 ,缝宽54mm self-adhesive APPmodified asphalt Coil4厚自粘性APP改性沥青卷材Non-woven fabrics无纺布一层25mm WS20 CementMortar Protection layer25厚WS20水泥砂浆保护层D 16.00 64.00 64.00 64.00 64.00 m m2 m2 m2 m2 5.00 80.00 13.00 832.00 120.00 7,680.00 18.00 1,152.00 15.00 960.00ooAluminum Alloy Glass3.6.1Window 2016铝合金玻璃窗2016Ot3.83.8.13.8.23.8.3OtheheScaffolding Support脚手架支撑Scaffolding of outer walls外墙脚手架Aproll散水3.6 - 12.80 m2 -

18,080.00 160.00 64.00 32.00 m2 m2 m 45.00 7,200.00 55.00 3,520.00 230.00 7,360.00 -Notes&